NEWTOWN SQUARE Commercial at Sector 95A‏ GURGAON

NEWTOWN SQUARE_Retail Shops & Food Court at Sector 95A‏_GURGAON

135 meter wide Pataudi Road,

Newtown Square is one of the 1st #commercial Projects being launched in the new #Gurgaon area. Located directly on rapidly developing growth corridor of new Gurgaon, the fastest growing hyper-potential zone, and one of the most desired area for real-estate investment. 

Shops Starting @ 22 Lakh

Food Court start @ 17 LACS ONLY

  UNIT DETAIL
GROUND FLOOR   200-1100 (SQ.FT)       @10,450 (PS.FT)
FIRST FLOOR   200-500   (SQ.FT)       @7950    (PS.FT)
FOOD COURTExclusive 18 Lockable Shops 300 – 700 sq.ft       @6600   (PS.FT)

PAY 35% IN 6 MONTHS REST NEAR TO POSSESSION

NewTown Square is a new commercial development in Sector 95A, Gurgaon. Located in a vast land area of 3 lack square feet, this project provides excellent connectivity options with 135 meter wide Pataudi Road, that connects the project site to upcoming Dwarka expressway, NH 8 and Manesar Industrial area. It is an exceptional designed project offering :

  • Retails shops on ground and first floor, where ground floor shops have grand space advantage raising 16 feet high roof.
  • The lower ground floor has a hyper market which has a direct access from the ground floor and car ramp, along with natural light flowing inside.
  • This project adds to its value with food court, cinema, kids and entertainment area on the second floor.
  • The third floor comprises of facilities such as spa with pool, all weather banquet hall and business center.
  • Service suites are located on 4th floor onwards.

Project Highlights

  • ·         A unique symbiosis of Premium Areas for Social, Entertainment, Corporate and Residential usage spread across 3.1 acres of area.
  • ·         State of the art design & International standard amenities through meticulous planning of over 300,000 Sq. Ft. by renowned architects & urban planners.
  • ·         A medley of facilities including Shopping, Retail, Cinema, Food Court, Hyper Market, Spa, Banquet & Serviced Residencies.
  • ·         High value engineering to ensure low operation & CAM Costs.
  • ·         Environmentally conscious Green Building Designs incorporating Solar Energy Generation, Recycling and latest conservation technologies.
  • ·         Escalators and High Speed Elevators
  • ·         Emphasis on socially responsible planning, safety and catering for all special-need individuals.
  • ·         Well planned vehicular and pedestrian traffic movement and Three level basement parking.
  • ·         Earthquake Resistant structure and building codes compliant.
  • ·         Three floors of retail spaces dedicated to the developed and fast developing premium residential projects located at walking distance with in the area.
  • ·         High Retail visibility and impact.
  • ·         Optimally sized units with low maintenance to suit all investment plans.
  • ·         Double height shops for International style retail format with independent service utilities.
  • ·         Hyper market and Anchor stores shall be major draw attraction.
  • ·         Centrally placed vast atrium with escalators.
  • ·         Wide corridors with continuous circulation for high captive footfalls.
  • ·         Air-Conditioned units with 100% Power Backup.
  • ·         Spacious Food court at 2nd floor level, boasting of the leading food and beverage outlets.
  • ·         Cinemas, Fun zone, Kids Zone are just some of the planned entertainment activities.
  • ·         Fine Dining areas.
  • ·         Business center with conferencing facilities.
  • ·         All Weather Banquet Hall for premium Social and Corporate Events.
  • ·         3 Screen Multiplex

Please note the PLC is as follows:

PLC Ground Floor First Floor
All Shops 7.5% 5%
Atrium facing 2.5% 2.5%
Corner facing 5% 5%
Main Road facing 7.5% 5%

    Price list attached

     EDC/IDC/IFMS – As applicable*

Exclusive payment plan apart from the ones mentioned for First Floor only (for ltd period):

  • Ø  Booking Amt – 10%
  • Ø  On Start of Excavation or 90 days – 25%
  • Ø  Completion of Super-Structure – 35%

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>